Philippine Construction Cost Estimator
Get an instant construction cost estimate calibrated to 2025-2026 Philippine market rates. Select your project type, location, floor area, and finish level.
Covers residential, commercial, and institutional projects. Itemized breakdown by structural, architectural, MEP, and site works. Regional pricing based on DOLE wage orders.
Estimated Cost
₱5,760,000
Per sqm
₱24,000
Total Area
240 sqm
Project Type
Select the type of construction project
Floor Area
Total floor area per storey in square meters (× 2 storeys = 240 sqm total)
Finish Level
Quality of materials and finishing works
Project Location
Region affects labor rates (DOLE wage orders) and material transport costs
Cost Estimate Breakdown
Estimated Total Construction Cost
₱5,760,000
Cost Distribution
Materials
₱2,880,000
Labor
₱2,016,000
Overhead
₱576,000
Contingency
₱288,000
By Category
Structural Works
Architectural Works
MEP (Mechanical, Electrical, Plumbing)
Site Works & Miscellaneous
Itemized Cost Breakdown
Structural Works
Architectural Works
MEP (Mechanical, Electrical, Plumbing)
Site Works & Miscellaneous
Key Material Estimates
Approximate quantities based on floor area. Actual BOQ may vary based on design. Prices are 2025-2026 NCR rates adjusted for your region.
| Material | Qty | Unit | Unit Price | Subtotal |
|---|---|---|---|---|
| Portland Cement (40kg bag) | 288 | bag | ₱285 | ₱82,080 |
| 4" CHB (Concrete Hollow Block) | 3,000 | pc | ₱14 | ₱42,000 |
| Deformed Bar 12mm (Ø12) x 6m | 864 | pc | ₱260 | ₱224,640 |
| Deformed Bar 16mm (Ø16) x 6m | 384 | pc | ₱465 | ₱178,560 |
| Washed Sand | 58 | cu.m. | ₱1,400 | ₱81,200 |
| Gravel (3/4") | 48 | cu.m. | ₱1,600 | ₱76,800 |
| Floor Tile 60x60 (standard) | 264 | sqm | ₱350 | ₱92,400 |
| G.I. Corrugated Sheet (0.4mm x 8ft) | 54 | sheet | ₱380 | ₱20,520 |
| Latex Paint (4L) | 84 | gal | ₱650 | ₱54,600 |
| Marine Plywood (4x8, 12mm) | 120 | sheet | ₱850 | ₱102,000 |
Disclaimer: This estimate is for guidance purposes only based on prevailing 2025-2026 Philippine construction market rates. Actual costs may vary depending on site conditions, soil type, specific design requirements, material availability, and contractor pricing. For an accurate Bill of Quantities (BOQ), consult a licensed Civil Engineer or Architect. Material prices are based on NCR baseline rates adjusted for your selected region.
Need a custom construction ERP?
This estimator is a sample of what we build. We develop full construction management systems — job costing, progress billing, equipment tracking, subcontractor payments, and financial dashboards — custom-built for Philippine construction firms.
Custom-Built
Not a template — built for your workflows
Real-Time Dashboards
Job costing & financial reports
8-12 Week Delivery
Working system, on time
Built by Medianeth — Custom software for Philippine construction firms
Construction Cost FAQ
Common questions about building costs in the Philippines
This tool provides a rough-order-of-magnitude estimate based on prevailing 2025-2026 Philippine market rates. It is useful for budgeting and feasibility assessment but should not replace a detailed Bill of Quantities (BOQ) prepared by a licensed Civil Engineer or Architect. Actual costs may vary by 15-25% depending on site conditions, design complexity, and material availability.