House Construction Cost in Metro Manila

Estimate house construction cost in Metro Manila using CostCalc PH NCR rates. Review finish-level budgets, local cost drivers, and planning tools.

Open the calculator

Metro Manila cost guide

Metro Manila is the CostCalc PH baseline because labor rates, contractor availability, and supplier access are concentrated in NCR.

Planning range

₱1,872,000 to ₱5,616,000

Baseline estimate

₱2,880,000

Baseline cost per sqm

₱24,000

Adjust this estimate Check build timeline

Baseline Scenario

120 sqm total two-storey residential house in Metro Manila with standard finish.

Total floor area

120 sqm

House type

Residential — 2-Storey

Region model

NCR (Metro Manila)

Default finish

Standard

Calculator input uses 60 sqm per floor x 2 storeys = 120 sqm total floor area.

Budget Split

Materials₱1,440,000

Labor₱1,008,000

Overhead₱288,000

Contingency₱144,000

Finish-Level Cost Comparison

These estimates use the same area, house type, and region so the table isolates the effect of finish level.

FinishCost per sqmEstimated totalTypical scope
Economic / Bare₱15,600₱1,872,000Basic structural finish, minimal interior works
Standard₱24,000₱2,880,000Standard residential finish with basic fixtures
Semi-Luxury₱33,600₱4,032,000Above-average finishes with quality fixtures
Luxury / High-End₱46,800₱5,616,000Premium materials and custom finishes throughout

Assumptions

  • Two-storey 120 sqm total floor area, regular urban lot access, normal reinforced concrete structure, and standard residential finish.
  • NCR wage and logistics assumptions are used directly from the CostCalc PH regional table.
  • The estimate excludes demolition, special traffic permits, parking rental during construction, high-rise condominium fit-out rules, and utility relocation.

Local Cost Notes

  • Metro Manila can have strong supplier access, but narrow roads, delivery windows, and limited staging space can raise actual site costs.
  • LGU processing, subdivision rules, and neighbor protection works should be validated before final budgeting.

Budget Watchouts

  • For NCR projects, contingency should cover logistics friction as much as material price movement.
  • A detailed BOQ is especially important when the site has demolition, party-wall, or access constraints.

Plan the Next Decision

A cost-per-sqm estimate is only the first checkpoint. Use the related planning tools to test schedule and financing before converting this budget into a contractor scope.

Open the interactive cost calculator Estimate the construction timeline Compare mortgage payment scenarios

For Contractors and Developers

If you estimate projects repeatedly, the same cost logic can be turned into quoting, job-costing, and project-control software for your team.

Construction software Philippines

Project dashboards, field reporting, and contractor workflows for Philippine teams.

View details

Construction ERP Philippines

Job costing, progress billing, purchasing, payroll, and equipment tracking in one system.

View details

Construction CRM software

Track inquiries, bid follow-ups, owner updates, and handoffs from sales to project delivery.

View details

Construction safety compliance software

Digitize site inspections, incident reports, Toolbox Meeting records, and compliance logs.

View details

Important Disclaimer

CostCalc PH produces rough-order planning estimates from 2025-2026 Philippine market assumptions. It is not a substitute for a signed design package, site inspection, structural analysis, contractor canvass, or detailed Bill of Quantities prepared by licensed professionals.

Questions About This Estimate

Short answers for common planning decisions before you request a BOQ.

What is the cost per sqm to build a house in Metro Manila?

CostCalc PH uses NCR as the baseline. The cost per sqm depends on house type and finish level, with standard residential two-storey work shown in the table on this page.

Why is Metro Manila construction often more expensive?

Labor rates, access restrictions, staging limitations, hauling, permits, and owner finish expectations can all push NCR projects above a simple material-and-labor estimate.

Can I use this Metro Manila estimate for nearby provinces?

Use the Cavite, Bulacan, or relevant regional page instead. Nearby provinces can have lower wages but different delivery and site logistics.